• Home
  • About
  • Contact
  • ePaper
Tuesday, September 8, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

DoWP, WD Kashmir rebuts news item ‘Residents protest Wildlife Department’s halt on critical road project in Budgam

Clarifies, it was anticipated that Road may pass through the Hokersar WCR & subsequently the User Agency was asked to suspend work till alignment of Road is checked

by KD Desk
May 30, 2024
in J&K, Latest News
0
DoWP, WD Kashmir rebuts news item ‘Residents protest Wildlife Department’s halt on critical road project in Budgam
Share on FacebookShare on TwitterWhatsappTelegram

SRINAGAR, MAY 30: The Department of Wildlife Protection (DoPW), Wetlands Division (WD), Kashmir today rebutted the news item published in local English daily on 30 May, 2024, headlined ‘Residents protest Wildlife Department’s halt on critical road project in Budgam’.

In an official statement issued here, the Department of Wildlife Protection, Wetlands Division Kashmir authorities have clarified that the article has been published by misrepresenting the actual fact.
While the fact is that the User Agency i.e Executive Engineer PW (R&B) Budgam had started the construction of a Road along the Bund in the vicinity of the Hokersar Wetland Conservation Reserve. The field staff of the

Department of Wildlife Protection anticipated that Road may pass through the Hokersar Wetland Conservation Reserve and subsequently asked the User Agency to suspend the work till the alignment of the Road is checked with respect to the boundary of the Wetland Conservation Reserve, the statement read.
The Range Officer concerned brought the matter into the notice of Wildlife Warden Wetlands Division, who in turn immediately issued the directions for the joint survey of the proposed Road.

The official communication further mentioned that in the joint survey GPS track of proposed Road was recorded and converted into KML file, which in turn was superimposed on KML file of perimeter/demarcation line of Hokersar Wetland Conservation Reserve. Proposed alignment of the road was found to intersect with the Demarcation line of Wetland, mainly at the starting and terminal part of the Road. The stretch of the proposed Road that was found to pass through the Wetland Conservation Reserve approximately measures nearly 1.5 KM in length

Wildlife Warden, Wetlands Division conducted a field visit jointly with the Assistant Executive Engineer and other staff of the PW (R&B) Department for ground truthing of the Maps generated after the first joint survey. The intersection of the Road with Wetland Demarcation line was ascertained and various alternative options were explored

It is worth mentioning here that the demarcation of the Hokersar Wetland Conservation Reserve was jointly conducted during 2018-19 by the Revenue Authorities, District Administration, Photo Interpretation (PI) Division, Forest Department in coordination with Wildlife Protection Department and subsequently a demarcation Map was generated which, was duly signed by all the concerned Officers/ officials who were the part of the demarcation process.

On 25 May, 2024 inspection of the said Road was conducted by the Regional Wildlife Warden, Headquarters, J&K on the request of the Wildlife Warden, Wetlands Division with intent to have his expert advice for the disposal of the matter. Earlier observations made by undersigned were found to stand, wherein, first and the terminal parts of the Road were found intersecting the Wetland boundaries.

Vide this office letter No: WLW(WL)/Estt/2024-25/302-05 Dated: 28-05-2024 User Agency/ Executive Engineer, PW (R&B) Division Budgam was advised to consider the realignment of the Road at the places where intersection was evident. He was further advised that proposal of the Road can be uploaded on the PARIVESH Portal for the due clearances required in the matter.

PARIVESH Portal is a single window system, for grant of Forest and Wildlife clearances in case a non forestry work is to be executed inside a Forest or Wildlife Protected area.

The allegations leveled by the local inhabitants are concocted and baseless as it has been made clear by this Division time and again that proprietary rights (if any) of the fringe communities shall be protected, however, land use shall be regulated and governed strictly as per the Wildlife Protection Act 1972 and in accordance with the Orders / directions issued by National Green Tribunal (NGT) in the matters of Wetland Conservation.
As a matter of record, it is worthwhile to mention here, that as per the directions of NGT land use of Wetlands shall not be subjected to any change.

Construction of the Road through the Hokersar Wetland Conservation Reserve is a clear violation of directions of NGT, User Agency Executive Engineer, PW(R&B) Division Budgam was advised that in case the Road shall pass through the Protected Area, due clearance from the competent authority is required.

KD Desk

Related Posts

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

August 21, 2026
DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion
J&K

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)
J&K

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
Next Post
J&K Students Association Writes to Home Minister Amit Shah to Reconsider Decision to Deny Government Jobs to Families of Stone Pelters in Kashmir

J&K Students Association Writes to Home Minister Amit Shah to Reconsider Decision to Deny Government Jobs to Families of Stone Pelters in Kashmir

Amid tourism surge, J&K Admin begins process to identify land for 5-Star hotels

Amid tourism surge, J&K Admin begins process to identify land for 5-Star hotels

Jampacked tourist destinations in Kashmir push visitors to LoC for ‘unique border experience’

Jampacked tourist destinations in Kashmir push visitors to LoC for 'unique border experience'

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Commissioner SMC reviews arrangements for Guru Nanak Dev Ji’s Birthday Celebrations

Commissioner SMC reviews arrangements for Guru Nanak Dev Ji’s Birthday Celebrations

2 years ago
K’taka Hijab row: Respect culture of the land, BJP MP to protesting students

Hijab Row: We will see: SC on plea challenging K’taka HC’s verdict on hijab

4 years ago
Israeli bus under shooting attack near West Bank settlements: Army

Israeli bus under shooting attack near West Bank settlements: Army

4 years ago
SPO Allegedly Kills Teacher Brother In Scuffle Over Land Dispute in Doda

Commissioner Secretary visits Government ITI Srinagar

3 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

ADC Anantnag Inspects SWM Treatment Plant at Uranhall

Eid-Milad-un-Nabi (SAW) Arrangements Finalised in Anantnag

Director Agriculture reviews progress on Centrally Sponsored Schemes and CAPEX

SKUAST-K, Mission YUVA, IIM Jammu sign tripartite MoU to accelerate youth-led Neo-Innovative Startups in J&K

Trending

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

by KD Desk
August 21, 2026
0

JAMMU, AUGUST 20: Minister for Jal Shakti, Forest, Ecology & Environment and Tribal Affairs, Javed Ahmed Rana,...

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

August 21, 2026
DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

August 21, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -