• Home
  • About
  • Contact
  • ePaper
Monday, November 2, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

LS Polls: Power Woes a new poll plank for parties in J&K

Parties gear up to corner BJP over erratic power supply in UT

by KD Desk
April 3, 2024
in J&K, Latest News, News, Politics
0
LS Polls: Power Woes a new poll plank for parties in J&K
Share on FacebookShare on TwitterWhatsappTelegram

Srinagar, Apr 03 : In the Union Territory of Jammu and Kashmir, electricity has emerged as a crucial election issue and is set to become the major poll plank for the parties in the upcoming Lok Sabha polls.

Despite ongoing efforts to bolster the power infrastructure, dissatisfaction simmers among over 20 lakh consumers, signaling widespread discontentment that political parties are poised to exploit in the upcoming elections.

As per news agency, the palpable frustration stems from the sluggish progress in rectifying the ailing electricity infrastructure, with rural areas bearing the brunt of dilapidated transformers, poles, and wires. While urban regions witness a semblance of progress, rural locales grapple with prolonged power outages during peak seasons, exacerbating the daily struggles of residents.

Over the past decade, various initiatives under the Prime Minister’s Development Program, Deendayal Upadhyaya Gram Jyoti Yojana, and the Integrated Power Development Scheme have injected substantial funds into power infrastructure enhancements. Despite these investments totaling billions of rupees, a permanent solution to the persistent power cuts has remained elusive, leaving citizens disillusioned and agitated.

The recent roll out of the Revised Distribution Area Scheme (RDSS) aims to redress the existing infrastructural deficits, with an estimated expenditure of Rs. 1600 crore earmarked to complete pending works in both urban and rural areas. While progress in urban centers nears completion, rural regions lag behind, with only 60 percent of the slated works accomplished thus far.

The power generation scenario in Jammu and Kashmir presents a paradoxical juxtaposition, with a total of 29 power plants generating 3550 MW of electricity. However, despite ample production capacity, inadequate infrastructure and transmission inefficiencies result in millions of units of electricity being squandered annually, exacerbating the prevailing crisis.

In rural areas, where power cuts are a recurrent phenomenon, the situation is dire, with loose wires and outdated infrastructure exacerbating the issue. Villagers endure prolonged outages, disrupting essential services like water supply and impeding daily activities. The installation of smart meters, while a step towards modernization, has failed to alleviate the persistent woes faced by rural residents.

As the political landscape heats up in anticipation of the forthcoming elections, political parties are poised to capitalize on the electorate’s disillusionment with successive governments’ failure to address the longstanding power crisis. From the AAP to the BSP, voices of dissent resonate, with promises of advocacy for a permanent solution to the power woes that have plagued the region for over two decades.

With promises of imminent completion of infrastructure upgrades under the RDSS, political leaders seek to assuage public ire and garner electoral support. However, amidst the cacophony of campaign rhetoric, the electorate remains wary, skeptical of mere promises without tangible results.

KD Desk

Related Posts

Power shutdown
J&K

Power shutdown

October 30, 2026
DC Jammu chairs NCORD meeting, reviews progress under Nasha Mukt Bharat Abhiyan
J&K

DC Jammu chairs NCORD meeting, reviews progress under Nasha Mukt Bharat Abhiyan

October 30, 2026
Sagar reviews Power Sector; emphasizes comprehensive winter preparedness, timely project completion
J&K

Sagar reviews Power Sector; emphasizes comprehensive winter preparedness, timely project completion

October 30, 2026
Next Post
Govt set to rationalize, streamline payment procedures for Infa projects

Govt set to rationalize, streamline payment procedures for Infa projects

DSEJ issues guidelines for confirmation of result of private schools

DSEJ issues guidelines for confirmation of result of private schools

DSEK constitutes committee to authenticate complaints against Pvt schools

DSEK constitutes committee to authenticate complaints against Pvt schools

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Cyber Police recover nearly Rs 8 core from fraudsters in 4 years

Cyber Police recover nearly Rs 8 core from fraudsters in 4 years

3 years ago
Indian diaspora in UK to hold car rally in support of BJP

Congress demoralising armed forces, Opposition being obstructionist in Parliament: BJP

4 years ago
SIU Sgr produces chargesheet against 2 accused terrorists

SIU Sgr produces chargesheet against 2 accused terrorists

3 years ago

05 Days Sericulture CBP concludes at Bandipora

3 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

Farmers participate in District-Level Programme marking release of 24th Instalment of PM-KISAN at Kulgam

B2B Networking Meet

Mandeep Kaur inspects ABC Facility at Tengpora; Directs Strengthening of Animal Care and Operational Arrangements

Lieutenant Governor’s message on the eve of Rashtriya Ekta Diwas

DC Kishtwar approves 09 Rent Assessment cases

DC Ramban finalizes arrangements for Rashtriya Ekta Diwas Celebrations, ‘Run for Unity’

Trending

Power shutdown
J&K

Power shutdown

by KD Desk
October 30, 2026
0

JAMMU, OCTOBER 30: Chief Engineer (Distribution) JPDCL Jammu has informed that the power supply to Jakhole, Bakhta...

DC Jammu chairs NCORD meeting, reviews progress under Nasha Mukt Bharat Abhiyan

DC Jammu chairs NCORD meeting, reviews progress under Nasha Mukt Bharat Abhiyan

October 30, 2026
Sagar reviews Power Sector; emphasizes comprehensive winter preparedness, timely project completion

Sagar reviews Power Sector; emphasizes comprehensive winter preparedness, timely project completion

October 30, 2026
Farmers participate in District-Level Programme marking release of 24th Instalment of PM-KISAN at Kulgam

Farmers participate in District-Level Programme marking release of 24th Instalment of PM-KISAN at Kulgam

October 30, 2026
B2B Networking Meet

B2B Networking Meet

October 30, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -

imunify-bot-check