• Home
  • About
  • Contact
  • ePaper
Tuesday, September 1, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

MLA Lolab reviews RDSS works in Kupwara Package

by KD Desk
June 27, 2025
in J&K, Latest News, News
0
MLA Lolab reviews RDSS works in Kupwara Package
Share on FacebookShare on TwitterWhatsappTelegram

SRINAGAR, JUNE 27: In order to assess the progress of works under the Revamped Distribution Sector Scheme (RDSS) in the Lolab Constituency (Kupwara Package), a review meeting was convened today at the Corporate Headquarters of Kashmir Power Distribution Corporation Limited (KPDCL), here.

The meeting was chaired by Qaiser Jamshaid Lone, Member J&K Legislative Assembly (Lolab Constituency).

Managing Director KPDCL, Mahmood Ahmad Shah was also present in the meeting.

Among others,  Superintending Engineer, Project Circle South, Er. M Hussain; Superintending Engineer, O&M Circle Sopore, Er. Dalbir Singh; Executive Engineer, ED Kupwara, Er. Mohammad Amin Shah; representative, PIA – NTPC and authorized representative, M/s Vikran Engineering & Exim Pvt. Ltd. attended the meeting.

The deliberations were aimed at undertaking a comprehensive appraisal of the physical and financial status of various sanctioned works being executed under the centrally sponsored RDSS in the Lolab region.

At the outset, MLA emphasized the instrumental role played by elected representatives in furthering infrastructure development, particularly in the power sector.

A consolidated overview of the project components, execution timelines, and bottlenecks was presented to the chair.

MLA, while acknowledging the ongoing efforts, underscored the need for immediate prioritization of critical works and sought strict adherence to stipulated timelines.

The Turnkey Contractor assured timely compliance and reaffirmed its commitment to expedite execution as per the mutually agreed milestones.

MLA further impressed upon the corporation the imperative of initiating requisite measures to ensure the provisioning of enhanced and uninterrupted power supply to the residents of the area. In this regard, he underscored the critical need for maintaining an adequate buffer stock of Distribution Transformers (DTs) across multiple capacities along with sufficient reserves of transformer oil, to facilitate timely response in the event of any emergent contingencies or unforeseen transformer outages.

Moreover, he laid particular emphasis on the augmentation of the existing Receiving Station infrastructure, including the revamping of the ageing 33kV Old Kupwara line, which continues to be a constraint on load-bearing capacity.

He also reiterated the strategic importance of expediting the establishment of the proposed Grid Station at Waheedpora, Sopore, which is envisioned to significantly bolster the transmission infrastructure and address the long-standing reliability and load management issues across the region.

To address field-level challenges, particularly with respect to Right of Way (RoW) constraints and local impediments, it was resolved that a joint site inspection involving the  MLA, KPDCL officials, PIA representatives, and TKC shall be conducted on 1st July 2025 at Lolab. This coordinated exercise is intended to fast-track execution through proactive site-level resolution and stakeholder collaboration.

In a significant development, the meeting also resolved to launch a Solar Rooftop (SRT) Promotion and Registration Campaign under the PM–Surya Ghar Muft Bijli Yojna. The campaign shall be ceremonially flagged-off with the inaugural registration for installation of rooftop solar plants. This pioneering gesture is envisioned to stimulate mass awareness and adoption of decentralized clean energy solutions among domestic consumers in the region.

KD Desk

Related Posts

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

August 21, 2026
DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion
J&K

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)
J&K

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
Next Post
DC Bandipora inaugurates multi-use USG machine at District Hospital

DC Bandipora inaugurates multi-use USG machine at District Hospital

ADC Bandipora visits Imambaras, reviews arrangements

ADC Bandipora visits Imambaras, reviews arrangements

Dharti Aabha Abhiyan conducted  at tribal village Ringzabal in Sukhnag

Dharti Aabha Abhiyan conducted  at tribal village Ringzabal in Sukhnag

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Kupwara man killed in hit and run case in Srinagar’s Rajbagh

4 years ago
DEO Baramulla holds meeting with Political Parties for smooth Assembly Elections

General Assembly Elections: Training Session held for Nodal Officers at B’la

2 years ago
DC Bandipora approves 75 Youth Entrepreneurship cases under Mission YUVA

DC Bandipora approves 75 Youth Entrepreneurship cases under Mission YUVA

1 year ago
‘World Autism Day’

‘World Autism Day’

2 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

ADC Anantnag Inspects SWM Treatment Plant at Uranhall

Eid-Milad-un-Nabi (SAW) Arrangements Finalised in Anantnag

Director Agriculture reviews progress on Centrally Sponsored Schemes and CAPEX

SKUAST-K, Mission YUVA, IIM Jammu sign tripartite MoU to accelerate youth-led Neo-Innovative Startups in J&K

Trending

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

by KD Desk
August 21, 2026
0

JAMMU, AUGUST 20: Minister for Jal Shakti, Forest, Ecology & Environment and Tribal Affairs, Javed Ahmed Rana,...

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

August 21, 2026
DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

August 21, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -