• Home
  • About
  • Contact
  • ePaper
Monday, July 27, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

Post-2014 flood management enhances Jhelum’s capacity by 30%, reveals RTI

by KD Desk
July 9, 2024
in J&K, Latest News, News
0
Post-2014 flood management enhances Jhelum’s capacity by 30%, reveals RTI
Share on FacebookShare on TwitterWhatsappTelegram

Raja Syed Rather

Srinagar, Jul 08 : After the devastating floods that struck Kashmir in September 2014, a comprehensive flood management initiative was launched to bolster the River Jhelum and its spill channels. Spearheaded by the Central Water Commission (CWC) and backed by significant financial investment, the efforts have resulted in much increase in the river’s carrying capacities at key points.

According to an RTI request filed by M M Shuja with the Chief Engineer’s office, Irrigation & Flood Control Department Kashmir, the capacity from Sangam to Padhshahibagh has risen from 31,800 to 41,000 cusecs.

The improvement is part of a broader strategy to implement Phase I and Phase II of the short-term measures proposed by a three-member group led by the Chairman of the CWC, formed by the Prime Minister of India in September 2014.

The RTI response, a copy of which is with the news agency, detailed the measures taken post-floods.

Following the floods, the Prime Minister of India directed the formation of a three-member group led by the Chairman of the Central Water Commission on September 18, 2014. The group proposed immediate, short-term, and long-term measures to address the situation.

The RTI revealed that the department swiftly plugged all breaches and restored numerous sites under Temporary and Permanent Restoration projects, costing Rs 163.11 crore and Rs 96.78 crore, respectively.

These actions were part of a broader strategy to implement Phase I and Phase II of the short-term measures.

Until long-term flood mitigation strategies were developed and approved, a Priority Flood Management Project was initiated to address urgent needs. This project’s main objective was to remove significant bottlenecks in the River Jhelum and its flood spill channels, providing immediate relief from low to moderate-magnitude floods. The Central Water Commission approved a detailed project costing Rs. 399.29 Crore, titled “Priority works—Comprehensive Plan for Flood Management Works on Jhelum—Phase-I,” in 2015-16. This project, funded under the FMBAP, is nearly complete.

As a result of Phase-I, the carrying capacity of the River Jhelum and its spill channels has increased significantly. The capacity from Sangam to Padhshahibagh has grown from 31,800 to 41,000 cusecs, while at Ram Munshibagh, it has increased from 27,000 to 32,000 cusecs. Additionally, the offtake at Padhshahibagh has expanded from 4,000 to 27,000 cusecs. In Wullar Baramulla, the outlet at Ningli has seen its capacity rise from 20,000 to 22,700 cusecs, and at Sopore, it has increased from 31,000 to 35,000 cusecs.

These enhancements reflect a significant improvement in the region’s flood management capabilities, providing better protection against future flooding events

KD Desk

Related Posts

Maintenance Works on Pahalgam Axis; Shri Amarnathji Yatra to Continue through Baltal Axis
J&K

Maintenance Works on Pahalgam Axis; Shri Amarnathji Yatra to Continue through Baltal Axis

July 25, 2026
Press Communique
J&K

Press Communique

July 25, 2026
Div Com Jammu reviews rain damage restoration works across Jammu Division
J&K

Div Com Jammu reviews rain damage restoration works across Jammu Division

July 25, 2026
Next Post
Rough patches ahead for Cong as JK readies for assembly polls this year

Rough patches ahead for Cong as JK readies for assembly polls this year

No power curtailment in Shia-dominated areas during Muharram: CE KPDCL

No power curtailment in Shia-dominated areas during Muharram: CE KPDCL

Resurgence of Cong in Jammu top agenda of BJP’s core group meet

Resurgence of Cong in Jammu top agenda of BJP’s core group meet

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Ranbir analyses himself: I am a sulker, but I eventually forgive and forget

Ranbir analyses himself: I am a sulker, but I eventually forgive and forget

3 years ago
“Nasha Mukht Abhiyan” campaign held at SMC Headquarters

“Nasha Mukht Abhiyan” campaign held at SMC Headquarters

4 months ago
GoI asks educational institutions to publish map of India in conformity with survey of India

GoI asks educational institutions to publish map of India in conformity with survey of India

2 years ago

2 road accidents in 2 days claim 6 lives in Ramban

2 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

Press Communique

Press Communique

Press Communique

MC Bandipora conducts cleanliness drive under ‘Safai Apnao, Beemari Bhagao’ campaign

VC SKUAST-K harvests Sweet Corn, felicitates winners of Sports Week at Wadura

SKUAST-K becomes Kashmir’s first University to hold fully Paperless PG Semester Exam

Trending

Maintenance Works on Pahalgam Axis; Shri Amarnathji Yatra to Continue through Baltal Axis
J&K

Maintenance Works on Pahalgam Axis; Shri Amarnathji Yatra to Continue through Baltal Axis

by KD Desk
July 25, 2026
0

Srinagar, July 25: In view of the repair and maintenance works required to be carried out on...

Press Communique

Press Communique

July 25, 2026
Div Com Jammu reviews rain damage restoration works across Jammu Division

Div Com Jammu reviews rain damage restoration works across Jammu Division

July 25, 2026
Press Communique

Press Communique

July 25, 2026
Press Communique

Press Communique

July 25, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -