• Home
  • About
  • Contact
  • ePaper
Friday, September 4, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

CEO, JKERA inspects progress on construction of new Infertility and Oncology Block at Lal Ded Hospital

Directs expeditious execution, parallel works and strict monitoring to meet timelines

by KD Desk
February 2, 2026
in J&K, Latest News, News
0
CEO, JKERA inspects progress on construction of new Infertility and Oncology Block at Lal Ded Hospital
Share on FacebookShare on TwitterWhatsappTelegram

SRINAGAR, FEBRUARY 02: Chief Executive Officer, J&K Economic Reconstruction Agency (ERA) /JTFRP, Shreya Singhal, today inspected the progress of work on the construction of the state-of-the-art 108-bed additional block for specialised Infertility and Gynae Oncology at Lal Ded Hospital, Srinagar.

The project is being executed under the World Bank funded Jhelum Tawi Flood Recovery Project (JTFRP) implemented by PWD (R&B), which is being constructed at an estimated cost of Rs 118 crore using seismic-resistant base isolation technology.

During the inspection, the concerned officers briefed the Chief Executive Officer about the salient features of the project, highlighting that the building is being constructed as per modern hospital architectural standards being adopted nationally and internationally. The G+5 structure with attic and stilt parking will house specialised zones including modular operation theatres, ICUs, High Dependency Units (HDUs), LDR suites, pre- and post-natal care wards, recovery wards and dedicated patient waiting lounges, with a total built-up area of 11,640 square metres.

The CEO was informed that foundation works of the building have been completed and that the project is entering a crucial phase, with planning and design nearing completion and prefabricated structural components being manufactured off-site and expected to reach the project location shortly.

Emphasising the importance of timely completion of this critical healthcare infrastructure, the CEO directed that the project be expedited and completed well before 31st August, with multiple activities taken up in parallel to avoid any time overruns. She instructed the Project Implementation Unit (R&B) and Project Management Support (PMS) teams to conduct weekly site visits to closely monitor progress and ensure adherence to timelines.

The CEO further stressed the need for streamlined coordination with key stakeholder departments, particularly the Health Department, to ensure seamless execution of works and timely integration of services.

Additionally, the CEO instructed the PIU to expedite procurement of medical, electrical and mechanical equipment, so that installation can proceed in sync with civil works as part of the integrated health sector project.

Senior officers including the Chief Engineer, PWD (R&B) (Central) Superintending Engineer, PWD (R&B) Central, Project Manager J&KERA Kashmir, Executive Engineer PWD (R&B) Central, Deputy Project Manager J&KERA Kashmir and other officials from PWD (R&B) and J&KERA accompanied the CEO during the site inspection.

KD Desk

Related Posts

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

August 21, 2026
DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion
J&K

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)
J&K

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
Next Post
DC Anantnag directs for time-bound, quality-checked redressal of Public Grievances

DC Anantnag directs for time-bound, quality-checked redressal of Public Grievances

DC Kulgam launches Sampoornata Abhiyaan 2.0

DC Kulgam launches Sampoornata Abhiyaan 2.0

DC Budgam reviews RGSA, SBM-G implementation, Stresses timely completion of Panchayat Infrastructure

DC Budgam reviews RGSA, SBM-G implementation, Stresses timely completion of Panchayat Infrastructure

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

BOPEE conducts Common Entrance Test for M.Sc. Technology Courses

BOPEE conducts Common Entrance Test for M.Sc. Technology Courses

3 months ago

DGP visits Baltal, Domail; takes stock of yatra arrangements

4 years ago
ECI recognizes Atal Dulloo as ‘Exemplary Leader’ for successful holding of Lok Sabha elections

ECI recognizes Atal Dulloo as ‘Exemplary Leader’ for successful holding of Lok Sabha elections

2 years ago
Polo View shopkeepers say prolonged revamp of market badly affecting business

Polo View shopkeepers say prolonged revamp of market badly affecting business

4 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

ADC Anantnag Inspects SWM Treatment Plant at Uranhall

Eid-Milad-un-Nabi (SAW) Arrangements Finalised in Anantnag

Director Agriculture reviews progress on Centrally Sponsored Schemes and CAPEX

SKUAST-K, Mission YUVA, IIM Jammu sign tripartite MoU to accelerate youth-led Neo-Innovative Startups in J&K

Trending

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

by KD Desk
August 21, 2026
0

JAMMU, AUGUST 20: Minister for Jal Shakti, Forest, Ecology & Environment and Tribal Affairs, Javed Ahmed Rana,...

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

August 21, 2026
DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

August 21, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -