• Home
  • About
  • Contact
  • ePaper
Tuesday, September 8, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home News J&K

DC Budgam chairs follow-up review to assess progress of 125-Bedded Hospital, 100-Bedded CCU at Reshipora

Emphasises timely completion, quality standards & strengthened healthcare infrastructure

by KD Desk
April 10, 2026
in J&K, Latest News, News
0
DC Budgam chairs follow-up review to assess progress of 125-Bedded Hospital, 100-Bedded CCU at Reshipora
Share on FacebookShare on TwitterWhatsappTelegram

BUDGAM, APRIL 10: In a follow-up review meeting, the Deputy Commissioner (DC) Budgam, Athar Aamir Khan, today assessed the progress of the under-construction 125-bedded hospital and the 100-bedded Critical Care Unit (CCU) at Reshipora Budgam.

The DC conducted a comprehensive review of both projects, which are being developed to significantly enhance healthcare infrastructure and ensure improved medical services for the people of the district.

During the meeting, the DC took a detailed appraisal of the proposed hospital infrastructure, including building arrangements, functional requirements, and floor-wise facilities.

He emphasised that the hospital must be developed as a modern, patient-centric institution equipped with all essential healthcare services.

A detailed status of the 100-bedded CCU, a G+3 structure, was also reviewed. The CCU is envisioned as a key facility for strengthening emergency and critical care services in the district.

Officials informed that since the project was handed over in May 2024, substantial physical progress has been achieved. Major works including pile cap casting, plinth level columns, plinth beam RCC, and ground floor slab have been completed. Construction of upper floors is progressing steadily, with nearly 50% completion of the first and second floor slabs, while AAC block masonry work is also underway.

It was further informed that the remaining work on the second floor slab is targeted for completion by mid-April 2026, and the overall project is expected to be completed by September 2026.

The DC directed the executing agency to ensure optimal utilization of resources to accelerate the pace of work. He stressed strict adherence to quality standards, safety norms, and timelines.

He reiterated that the 125-bedded hospital and the 100-bedded CCU at Reshipora Budgam will play a transformative role in strengthening healthcare delivery, particularly in critical and emergency care services.

The DC instructed officers to maintain close coordination, promptly address bottlenecks, and ensure timely completion of both projects for the larger public benefit. He further reiterated that the district administration remains committed to augmenting healthcare infrastructure and providing accessible, quality medical services to the people of Budgam.

The meeting was attended by JD Planning, SE R&B, officials from Jal Shakti, CMO, concerned executive engineers, and other officers.

KD Desk

Related Posts

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

August 21, 2026
DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion
J&K

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)
J&K

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
Next Post
DDC Shopian reviews preparation of District CAPEX Budget 2026–27

DDC Shopian reviews preparation of District CAPEX Budget 2026–27

Govt committed to equitable development of Jammu, Srinagar cities: Deputy Chief Minister

Govt committed to equitable development of Jammu, Srinagar cities: Deputy Chief Minister

Press Communique

Press Communique

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Power shutdown

Power shutdown

2 years ago
DLSA Srinagar observes World Elder Abuse Awareness Day

DLSA Srinagar observes World Elder Abuse Awareness Day

1 year ago
Weather to remain dry & hot in J&K, Ladakh during next 24 hours

LCMA installs highest water shooter aerator/fountain inside Dal Lake

3 years ago
Aadhaar usage records growth, 25.25 crore e-KYC transactions in Sep

Aadhaar usage records growth, 25.25 crore e-KYC transactions in Sep

4 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

ADC Anantnag Inspects SWM Treatment Plant at Uranhall

Eid-Milad-un-Nabi (SAW) Arrangements Finalised in Anantnag

Director Agriculture reviews progress on Centrally Sponsored Schemes and CAPEX

SKUAST-K, Mission YUVA, IIM Jammu sign tripartite MoU to accelerate youth-led Neo-Innovative Startups in J&K

Trending

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI
J&K

Javed Rana launches ₹14.38 cr water supply projects for Upper Thathar, Sidhra under SASCI

by KD Desk
August 21, 2026
0

JAMMU, AUGUST 20: Minister for Jal Shakti, Forest, Ecology & Environment and Tribal Affairs, Javed Ahmed Rana,...

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

DC Anantnag reviews AgriStack Progress, Directs Time-Bound completion

August 21, 2026
DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

DC Budgam reviews arrangements for Eid-ul-Milad-un-Nabi (S.A.W.)

August 21, 2026
DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

DC Bandipora Chairs DCC/DLRC Meeting; Calls for Accelerated Priority Sector Lending and 100% KCC Saturation

August 21, 2026
DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

DC Anantnag reviews implementation of TB Mukt Bharat Abhiyan, directs 100% screening, strengthened block-level monitoring

August 21, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -