• Home
  • About
  • Contact
  • ePaper
Tuesday, April 14, 2026
No Result
View All Result
Kashmir Digest
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz
No Result
View All Result
Kashmir Digest
No Result
View All Result
Home Top News

Railways’ longest tunnel constructed in Kashmir

by Uzair Jan
March 15, 2022
in Top News
0
Railways’ longest tunnel constructed in Kashmir

File photo

Share on FacebookShare on TwitterWhatsappTelegram

New Delhi: Mountainous regions are dotted with tough geographical terrain where quality railways are a blessing to remain connected to the mainland. In Kashmir, the rail route owes its complexity to the dangerous rugged geography of the Himalayas. But the engineering marvel of the Udhampur-Srinagar-Baramulla Railway Link (USBRL) has stunned the nation with its extraordinary approach in building its main – T-49 tunnel in an impossible terrain.
The last few years witnessed slow progress in the project due to the pandemic but with its expert team today tunnel T-49 has surpassed the 11.2-km long Pir Panjal Tunnel on the Banihal-Qazigund section of the Kashmir Railways Project. At a length of 12.758 km, T-49 is the longest tunnel of Indian Railways, running between Sumber and Arpinchala station of Katra-Banihal section of USBRL mega project.
The USBRL project is set to be 272 km long, constructed on access roads connecting 147,000 people in 73 villages; out of which 161 km that connects 29 villages, has already been commissioned and is in operation. The course includes numerous bridges, viaducts, and tunnels. The young Himalayas are geologically unpredictable. T-49 has two burrows for safety — the main tunnel and an escape tunnel. In line with international standards, the escape tunnel runs parallel to the main tunnel, connected by cross passages every 375 metres to allow for rescue and restoration work.
It uses the new Austrian Tunneling Method (NATM), which is a novel approach to the “drill and blast” technique in the teetering Shivalik Hills. Its cross-section profile is designed to give it a horseshoe appearance and built to accommodate a speed of 100 km per hour.
The north gateway of the tunnel is located near Arpinchala village of Ramban district situated in Mahu-Mangat Valley at an altitude of 1,600 m. The south gateway of Tunnel T-49 is located in the quaint Sumber village, 45 km from the district headquarters Ramban in Jammu and Kashmir at an altitude of 1400 m.
Though obstacles were many — shear zones, perched aquifer, highly jointed rock mass, high ingress of water, etc., the engineers successfully won them over. The local population also earned employment in the construction work.
The track’s alignment was the biggest engineering challenge ever faced; only next to Tibet’s Qingzang Railway, permafrost at 5,000 m above sea level. To add to the list of achievements, USBLR has credited itself with a 1,315 metre-long bridge, 359 m above the riverbed of the Chenab River; and another 657-metre-long bridge over Anji Khad, 186 m above the riverbed. For constructing the bridges Weathering Steel is used to do away with the need for painting. Situated in Reasi district, the bridge over the Chenab River is the world’s highest bridge, 30 metres higher than Eiffel Tower!
In the Udhampur-Katra section the challenges are very peculiar and not previously encountered anywhere. Indian Railways have fought the issues with steel arches, lattice girder support, and several feet of shotcrete. As bank engines will not be used in the railway, the journey will be quicker. There will be a provision for future doubling on major bridges, and future electrification of the line. At first, the rail line will use diesel locomotives as the region lacks electric bandwidth.
The 111-km stretch between the lower Himalaya’s Katra-Banihal section is also under progress at a rapid pace. It has 37 bridges of which 20 are complete, and 35 tunnels of which 27 are the main ones, and 8 are escape tunnels.
The world’s most advanced and modern technologies are being used for the planning and construction of this project. At many instances, new technologies were developed and sometimes existing methods were used in innovative ways in consultation with experts from India and abroad for the execution of the project.
India’s dream of fully integrating with the Valley is finally tangible with the Kashmir Railway Project ready to join the Indian Railways canvas by 2023. The project is the highest altitude railway network in India — defying gravity on the impossible terrain of the Pir Panjal mountain range. Indian Railways has prepared a National Rail Plan to create a ‘Future Ready’ Railway system by 2030. From the perspective of tourism, trade and commerce, and the economy in general, the people of J&K will be able to explore novel opportunities for business and employment. The story of Kashmir Railways is sure to go down as the new chapter of the region’s glory, development, and prosperity.
(IANS)

Uzair Jan

Related Posts

Zero tolerance against substandard drugs: DFO
Health

Zero tolerance against substandard drugs: DFO

May 7, 2024
Bukhari Makes Historic Visits Jamia Mosque, a First Among Mainstream Leaders Since 1990s
J&K

Bukhari Makes Historic Visits Jamia Mosque, a First Among Mainstream Leaders Since 1990s

May 6, 2024
LG-Sh.Manoj-Sinha-addressed-13th-National-Voters-Day-celebrations-in-Jammu-3
J&K

India’s Development Gains New Speed, Scale: LG Sinha

May 6, 2024
Next Post

Russia's reported calls for military supplies, economic assistance put China in a fix

Russia bans Instagram, blocks access for 80 mn users

Russia bans Instagram, blocks access for 80 mn users

Russian missile strikes another TV tower in Ukraine

Ukraine suspends recruitment of foreign mercenaries after strike on Yavoriv

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recommended

Create common platform for availing all Government Services: Officials told

Advisor to J&K LG Rajiv lauds NCC cadets for high ‘zest’

3 years ago
Amit Malviya files criminal complaint against ‘The Wire’ with Delhi Police

Amit Malviya files criminal complaint against ‘The Wire’ with Delhi Police

3 years ago
No Kashmiri student will be made to shave their beard, and their culture and religion won’t be interfered with; TN Health Minister informed JKSA

No Kashmiri student will be made to shave their beard, and their culture and religion won’t be interfered with; TN Health Minister informed JKSA

2 years ago
DDC Reasi takes stock of developmental needs in Suketar Village

DDC Reasi takes stock of developmental needs in Suketar Village

2 years ago

Categories

  • Big Story
  • Blog
  • Business
  • Court
  • Cricket
  • Economy
  • Ed-Op
  • Editorial
  • Education
  • Finance
  • Football
  • Health
  • J&K
  • Latest News
  • Local
  • Marketing
  • National
  • News
  • Opinion
  • Other
  • Politics
  • Regional
  • Religious
  • Science and Tech
  • Show Biz
  • Sports
  • Startup
  • Top News
  • Tourism
  • UT Ladakh
  • World
No Result
View All Result

Highlights

J&K F&ES launches Fire Service Week; reports 25% drop in fire Incidents, ₹5,000 cr property saved in 2025

CM Omar Abdullah inaugurates ₹4.30 crore Fruit & Vegetable Processing Centre in Anantnag, Facility to boost horticulture value chain

Lieutenant Governor attended upgradation ceremony of ‘Apna Bhojanalaya’ at GMC Jammu

Divisional Awareness Programme concludes with widespread outreach across Jammu Division

ADC meets members of Hotel Association to boost tourism coordination in Bhaderwah

Press Communique

Trending

MLA Mankotia inaugurates Annual Baisakhi Mela at Binisang
J&K

MLA Mankotia inaugurates Annual Baisakhi Mela at Binisang

by KD Desk
April 14, 2026
0

CHENANI, APRIL 14: The annual Baisakhi Mela at Binisang was today inaugurated by Member Legislative Assembly Balwant...

CMO reviews functioning, ongoing works at PHC Assar

CMO reviews functioning, ongoing works at PHC Assar

April 14, 2026
Nasha Mukt JK Abhiyaan: DC Anantnag visits PMPE Colony Vessu, Advises Youth to Denounce Drug Menace

Nasha Mukt JK Abhiyaan: DC Anantnag visits PMPE Colony Vessu, Advises Youth to Denounce Drug Menace

April 14, 2026
J&K F&ES launches Fire Service Week; reports 25% drop in fire Incidents, ₹5,000 cr property saved in 2025

J&K F&ES launches Fire Service Week; reports 25% drop in fire Incidents, ₹5,000 cr property saved in 2025

April 14, 2026
CM Omar Abdullah inaugurates ₹4.30 crore Fruit & Vegetable Processing Centre in Anantnag, Facility to boost horticulture value chain

CM Omar Abdullah inaugurates ₹4.30 crore Fruit & Vegetable Processing Centre in Anantnag, Facility to boost horticulture value chain

April 14, 2026
Kashmir Digest

©Kashmir Digest -

Navigate Site

  • Home
  • About
  • Contact
  • ePaper

Follow Us

No Result
View All Result
  • Home
  • News
    • Local
    • National
    • Regional
    • World
  • Business
    • Economy
    • Finance
    • Tourism
    • Startup
    • Marketing
  • Ed-Op
    • Editorial
    • Opinion
    • Blog
  • Health
  • Sports
    • Cricket
    • Football
    • Other
  • Science and Tech
  • Show Biz

©Kashmir Digest -